Bridge work started at River Ridge Construction in 2007 with county bridges and head walls.  Since then, we are building GRS (Geosyntheticaly Reinforced Soil) bridges along with structural steel.  Cranes are used to drive pilings, set steel and concrete bridge beams and structural steel.  Our certified welders are equipped with welding trucks and work on site welding steel beams and H-pilings.

As the prime contractor, our services include mobilization, slope protection (rip rap placement), site demolition and excavation.

As prime contractor, we also provide bonding and certified payroll reports when needed.

jesse
Jesse Vap, Bridge Coordinator Email: jesse@riverridge1.com